By Lara Sokoloff
The renovation of the senior parking lot was completed over Spring Break, Head of Campus Operations JD DeMatte said. The renovation began during winter break and lasted about three months.
The renovation included adding the Wolverine Walk, a sidewalk that stretches along the east side of the senior parking lot, and widening the driveway. The administration hopes that these renovations will make the student parking lot safer for all students, DeMatte said. The final stage of the renovation included repainting the driveway and senior lot over Spring Break.